Construction specifications and quantity review
Keep project specifications and measured design information alongside the drawing. Review inputs and quantities before using them to price the work.
Keep the assumptions visible.
A proposed size or build-up should remain unconfirmed until it has been checked for the job.
- Record the proposed construction and project inputs.
- Review the associated measured quantities.
- Confirm missing specifications before pricing the work.
Know what each quantity is based on.
A number is only useful for estimating when its basis is clear. Keep dimensions, material choices and proposed build-ups alongside the project information, so a quantity can be traced back to the scope that produced it.
Separate supplied specifications from working assumptions. An opening size, insulation build-up or foundation detail can affect several parts of the price. When an input changes, review the related quantities and scope before using the new figure in the quote.
How it fits a real job.
Before pricing a roof, record the reviewed area, covering and build-up. Check which figures are measured, which are supplied and which still need confirmation. Review waste, access and installation labour separately from the basic material quantity.
A few useful answers.
Can the software choose structural sizes for me?
Do not treat a generated suggestion as structural design. Member sizes, foundation details and other engineering decisions require the appropriate supplied specification and review.
Why keep unconfirmed values visible?
It helps prevent an assumption from becoming an apparently settled quantity or price. Resolve it, or clearly identify the allowance, before issuing the quote.