Job management software for UK trades
Keep job details, related quotes, drawings and activity together so the team can find the information it needs.
One place to pick up the job.
A shared job record makes it easier to move between the office discussion and the work on site.
- Open the customer and project details.
- Find the related quote, drawing and activity.
- Keep the next steps with the project.
See it in use.
Follow the work through scheduling, site records and project costs.
The walkthrough will be recorded using the public-release app.
Explore the planned demosKeep the project record easy to pick up.
A job passes through different conversations and people. Customer details, scope, drawings, bookings and progress notes need to remain connected so the next person can understand the context without reconstructing it from separate messages.
Keep the current work distinguishable from earlier versions. When the customer changes the scope, preserve the relationship between the original quote and the new discussion. A project record is most useful when it helps the office and site find the right information for the next task.
How it fits a real job.
Before a return visit, open the project to review the relevant quote, drawings and site notes. Check what has changed since the previous visit and what information still needs to be confirmed.
A few useful answers.
Does this include a complete construction programme?
The calendar and job records are separate from a full dependency-based construction programme. A complete Gantt workflow was not recorded as built in the saved product review.
Can the team use the same job information?
The project and workforce areas are intended to support shared job context. What each person can see depends on their access role and the product workflow.