Heating report imports for project records
Bring supported heating-report CSV data into the trade workflow and keep the report context with it.
Bring the report into the workflow.
Imported report data is supporting information. It is not a substitute for a checked heating design.
- Prepare a supported heating-report CSV.
- Include the report and author context.
- Review the imported information against the original.
Keep the imported information traceable.
A report import is useful when the information can still be understood in the context of its source. Keep the report details and author context with the imported values so another person can tell what the data represents.
Check units, field mapping and completeness against the original file. An import can move data into the workflow, but it cannot establish that the underlying design or calculation is suitable for the building. Missing or unexpected values should be resolved before the data is used further.
How it fits a real job.
Prepare a supported heating-report CSV, review the source and field meanings, then compare the imported information with the original report before referring to it in the project.
A few useful answers.
Can I import any heating report format?
No universal format support is claimed. Check the supported CSV structure and mapping before preparing the import.
Does import validate the heating design?
No. Imported information remains supporting project data. Design suitability and calculations need the appropriate professional checks.